Mukilteo Beacon - Your Hometown News Source

By David Pan 

Pedestrians now have easier access to waterfront

 

Last updated 6/2/2021 at 10:48am

David Pan

The new crosswalk and traffic signal at First Street and Mukilteo Speedway.

A major impediment for pedestrians walking to the Mukilteo waterfront has been eliminated.

Pedestrians now are able to use the right side (east) of the walkway on the SR-525 bridge, which previously had been closed because of an active construction zone related to the new road connecting the speedway to the ferry terminal. Construction of First Street has been completed, and the new traffic signal and crosswalk are now fully operational.

Prior to the opening of the right side of the walkway, pedestrians had to cross the Mukilteo Speedway to use the left (west) side of the walkway. Washingto...



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Our Family of Publications Includes:

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2021

Rendered 09/22/2021 18:43