Mukilteo Beacon - Your Hometown News Source

general and specialty care dentist make appointment

Work continues on old ferry terminal, clearing way for new road

 

Last updated 3/11/2021 at 11:11am

Courtesy of Washington State Ferries

The vehicle bridge used to drive onto the ferry (above), was lifted away in one large piece and dropped onto a waiting barge to be hauled away. This is where motorists used to drive onto the ferry.

Washington State Ferries (WSF) reports that crews are working to demolish the old ferry terminal structures to make way for the permanent road with traffic signals that will connect the terminal to SR-525.

To reduce confusion about the temporary road into the site, WSF has created a map showing how all modes of transportation access the terminal. The map also shows where people connect with transit. Find the map at https://bit.ly/3kzcc9K

For people picking up or dropping off passengers, short-term parking spots are available along the new First Street, parallel to the terminal building, al...



For access to this article please sign in or subscribe.



 

Reader Comments(0)

 
 

Our Family of Publications Includes:

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2020

Rendered 04/19/2021 08:49